yeah i was thinking the same thing after i read the best pipe down pipe thread but the hardest is going to be the up pipe so i was just going to do that and get that out of the way then it will just be to put the down pipe on . i shouldent hurt to use the same gaskets over just till the new down pipe comes in .



LinkBack URL
About LinkBacks

Reply With Quote
. We can install jeffs boost gauge too if the pods in .



Bookmarks