One is voltage in the other is voltage (signal) out. All that matters is voltage signal out.
This is a discussion on Tps help! within the General Maintenance, Troubleshooting & Accidents. forums, part of the Tech & Modifying & General Repairs category; When testing the TPS with a volt/OHM meter on the 20K scale, I know U put one lead on the ...
When testing the TPS with a volt/OHM meter on the 20K scale, I know U put one lead on the middle prong and then the other lead on either side. I was wondering when testing should both sides do the same thing? The right side transitions pretty smooth, but the other side stays at 3.14
Bookmarks